
Project intake
Bring Riverclack to your design.
Describe the architectural intent and project type — we return a preliminary bill of materials, a detail proposal and a delivery schedule within 48 hours. Supply runs direct from the Italian Riverclack factory.
Who this is for
Architects, general contractors, owners and installers.
01
Architect / design studio
Lock detailing, minimum slope, bending radius, BIPV — drawings and specifications ready for Stage D documentation.
02
Owner / developer
Indicative cost in €/m², lead time from the Italian factory, Riverclack warranty options.
03
General contractor
Panel delivery to site, on-site roll-forming, EAEU certificates, technical supervision.
04
Installer
Project authorisation, Riverclack lock training, technical supervisor from Terra-Zenith and the factory.
Intake form
Describe the project — we reply within 48 hours.
More detail = more accurate preliminary. Roof area, slope, structural scheme and substrate are the main inputs for Riverclack lock selection.
What happens after you submit
From inquiry to shipment — four steps.
01 · 48 hours
Technical response
A Terra-Zenith architect reviews the design intent and returns targeted detailing questions.
02 · One week
Preliminary BoQ
Area, panel profile, lock type, wind and snow loading per SP 20.13330. Price in €/m².
03 · 2–3 weeks
Factory sign-off
Final details, colour and panel lengths are confirmed with the Italian Riverclack factory. Contract and deposit.
04 · 6–10 weeks
Supply and on-site supervision
Italian production, delivery to site, on-site roll-forming, technical supervisor present.
Riverclack — patentlı standing-seam замок без перфорации, поставка с итальянской фабрики. Сертификаты ЕАЭС, шеф-монтаж, гарантия от производителя.
← Zenith landing